|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Installation and Commissioning by Engineer |
| Warranty: | 12 Months |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Different Model Of Instant Noodle Machine For Sale | ||||
| Model | Output | Power | Steam Consumption | Size |
| GY-1 | 30,000PCS/8H | 42 kw | 1000-1200KG/H | L45m*W5m*H2.5m |
| GY-2 | 60,000PCS/8H | 56 kw | 1200-1400KG/H | L49m*W5m*H2.5m |
| GY-3 | 120,000PCS/8H | 83 kw | 1600-1800KG/H | L60m*W6m*H3m |
| GY-4 | 160,000PCS/8H | 106 kw | 1900-2100KG/H | L85m*W6m*H3m |
Detailed Main Equipment Picture Of High Efficiency Instant Noodle Production Line
| High-quality after-sales service | Engineer services for overseas machinery services |
| 1.The distribution map requested by the buyer will be provided. 2.Process operation manual will be provided after delivery. 3.Provide 1 year complete warranty and lifetime maintenance services. 4.Free fragile spare parts will be sent out with the packing box. 5.The first installation can be completed by the equipped engineer. |
1.Provide free consultation service before, during and after sale. 2.Free project planning and design services. 3.Free debugging of equipment until everything is normal. 4.Free equipment maintenance and personal operation training. 5.Provide free new production process and formula. |